Description
Mazzei (C75 CVA) 1.25" Check Valve for 2" Injectors PVC (1.25" FNPT x 1" Hose Barb Connections) Temp Meter π§ Pro Tip: Always flush π§ Pro Tip: Always flush the CBC 10 for at least 5 minutes after installation to clear carbon fines Membrane Installation Protocol